How do I configure the Viewpoint Vista Integration?

This article highlights all of the settings of the integration, what they do, and where they are.

Accessing Integration Settings

  • Navigate to the Integrations section.

  • Click on the Viewpoint Vista logo to load the list of jobs.

  • The hamburger menu in the top right of the integration card will show you all of the pages for this integration

Company Level Settings

  • Access settings via the Settings option in the upper right hamburger menu of the integration.

  • Cost Types for Phase Code Sync

    • Choose which cost types of your phase codes you want to sync from Vista

      • Example: Enter "1" to sync Labor Phase Codes
    • Note: Only cost types listed here will transfer over. Phase codes without the entered cost types will not be synced.

  • Employee Sync Settings

    • Block Synced Fields

      • This setting is enabled by default. It will block any field that is mapped to Vista from being modified in SmartBarrel.
    • Reset to default on first sync or re-hire
      • If enabled, synced employees will reset to the default app settings in the section below
      • If disabled, the worker sync will not modify the workers app settings
    • Default app settings

      • Enable Mobile App: Controls if a worker can see projects and punch-in on the mobile app

        • Enable Work Summary: Controls if workers can submit work summaries from the app
        • Enable Incident:Controls if workers can submit incidents from the app
        • Enable Toolbox Talk: Controls if workers can submit toolbox talks from the app
    • Mapping Companies
      • Company drop-down:  Select the contractor in SmartBarrel that should be mapped to the respective company in Vista
      • Sync Projects: When enabled, we will bring jobs and cost codes from the selected Vista Company and make them available for syncs.
      • Sync Workers: When enabled, we will sync the PR Employees from the Vista company and add them to the SmartBarrel contractor from this section.

If you intend to sync multiple companies from Vista with SmartBarrel, please notify the SmartBarrel team so they can ensure your App Xchange workspace is configured to support this use case.

  • Start Work Weekday

    • Select the day of the week that starts your weekly pay periods in Vista. (e.g., select Monday for a Monday-Sunday pay period).

  • Payroll End Date

    • Specify payroll end date for time card batches.

Worker Sync Settings

  • Auto Sync

    • Enable auto sync for hourly worker updates.

    • If disabled, manual syncing is required.

Project Level Settings

  • Access project settings by clicking the gear on the integration banner in your project or by navigating to the integration projects page and clicking edit on the desired project. 

  • Shift Approval

    • Option to send only approved shifts to the timecard in Vista.

  • Cost Code Sync

    • Enable auto-sync for cost codes or opt for manual syncing.