This article will show the steps to add a manual shift for a worker within the timesheet.
Step 1. Go to the project timesheet, find the company that the worker belongs to, and click on the "+" sign
Step 2. Click on "Add shift"
Step 3. Enter all the shift time details. You have the following options:
- Add the complete shift or an individual Punch In/ Punch Out.
- Apply the break time rules from the project settings by checking the "Apply Break Time Rules' box or apply a specific break time within the "Break" box.
- A note is required before saving.
Video: